These photos show how Jeff and Brendan prepare the ground so the basement floor can be poured. Mike worked on closing up the chimney opening for the gas fireplace installation. Keith worked inside to make a wall for the livingroom where the gas fireplace pipes to the roof will be installed by Wilke Heating in mid March. Keith glued down the vapour barrier on the foundation to protect the cement. John finished the flap dog doors for the kennel room.

Jeff smoothing gravel and
preparing for the basement floor.
Mike & Keith making gas fireplace structure.
Mike working on the chimney.
Keith installing vapour barrier over gas fireplace.
Keith building fireplace structure.
Keith gluing vapour barrier.

Gas fireplace unit in plastic.

John installing flap dog doors
in kennel room with Sunny.